Coflyr · Backend model field catalog
ProductionPlanningConfiguration
public.ProductionPlanningConfigurations.
12 mapped fields4 field groupsGenerated 2026-10-06
Every mapped scalar field appears once. Types and nullability come from the current EF model snapshot. Navigation properties and unmapped DTO fields are outside this page. Purpose text is inferred from names and should be checked against the feature workflow.
Identity and naming
2 fields| # | Field | EF type | Storage | Business purpose |
|---|---|---|---|---|
| 1 | Id | Guid | Required | Stable identifier for this record. |
| 2 | ConfigurationName | string | Required | Records configuration name for this production planning configuration. |
Status and controls
4 fields| # | Field | EF type | Storage | Business purpose |
|---|---|---|---|---|
| 1 | Active | bool | Required | Indicates whether active applies to this production planning configuration. |
| 2 | ConflictDetectionEnabled | bool | Required | Indicates whether conflict detection enabled applies to this production planning configuration. |
| 3 | ShowInternalMilestones | bool | Required | Indicates whether show internal milestones applies to this production planning configuration. |
| 4 | StaggerEnabled | bool | Required | Indicates whether stagger enabled applies to this production planning configuration. |
Audit and revision
2 fields| # | Field | EF type | Storage | Business purpose |
|---|---|---|---|---|
| 1 | SystemAuditId | Guid? | Nullable | Links to system audit history when this model stores the reference. |
| 2 | UpdateId | Guid? | Nullable | Links to the preceding revision or update record. |
Other fields
4 fields| # | Field | EF type | Storage | Business purpose |
|---|---|---|---|---|
| 1 | ConfigurationCode | string | Required | Records configuration code for this production planning configuration. |
| 2 | CriticalEventPriority | int | Required | Records critical event priority for this production planning configuration. |
| 3 | OtherEventPriority | int | Required | Records other event priority for this production planning configuration. |
| 4 | PlanningHorizonDays | int | Required | Records planning horizon days for this production planning configuration. |